🔄 Bullwhip Effect Analysis Dashboard
Closed-Loop Supply Chains with Refurbishment Constraints
🎛️ Parameter Controls
Return Rate (ρ)
30%
Refurbishment Delay (τ)
3 periods
Success Rate (φ)
80%
Forecast Smoothing (α)
0.30
Update Analysis
Set Optimal
Run Simulation
Bullwhip Effect
1.45
Constraint Rate
8%
Stability Score
75
System Efficiency
82%
📊 Bullwhip Surface
📈 Echelon Comparison
🔥 Constraint Heatmap
⚖️ Trade-off Analysis
📉 Time Series Simulation
💡 Key Insights
Current configuration shows moderate bullwhip amplification
Constraint rate is within acceptable range (<10%)
System operates in transition zone - consider parameter adjustment
Reducing delay by 1 period could improve BWE by 15%